12.28.2010
2010_10_11 Dave: Tranny Linkage
by Big Chief
12.12.2010
2010_08_18 Dave: Tranny Engine
by Big Chief
11.04.2010
2010_08_27 Biff: Tranny Shop
by Big Chief
11.04.2010
2010_08_27 Guy: Joey’s Transmission Shop
by Big Chief
11.04.2010
2010_08_18 Guy: 3 Speed Tranny off to be checked
by Big Chief
09.26.2010
2010_08_18 Biff: Tranny off to be built!
by Big Chief
07.04.2010
03.22.2010
Here we are installing Laurens’s transmission and doing some work on his passenger door prior to re-installing it. These pics are from before the big parts update posted below, but we knew Laurens wanted those pics first.
01.04.2010
December 23- Cathy’s Tranny Pull and Disassembly
by Big Chief
12.19.2009
2009_11_19 Ammar: Parts Painting
by Big Chief