11.07.2012

 

 

02.18.2011

12.12.2010

12.11.2010

Drilled out wheel well spot welds;  Drilled out inner wheel wells spot welds;  Removed right hand wheel well; Ground all spot welds clean and wire-brushed all rust in preparation for wheel well installation;  Also inspected right-hand rocker, cleaned out rockers and began to remove spot welds for right hand rockers.

We’re continuing to clean up the front fenders, and Tim has etch primed and started welding the repair panel on. When he is finished we will smooth everything out and gray prime everything over.

There’s a lot going on here! We’ve removed the front valance and both fenders on Cathy’s Mustang, and are showing the condition of the metal as much as we can. We also drained and removed the radiator and have just pulled the engine.