02.01.2011
Installed gauge cluster and mounted into place. Aligned an fit the rest of dash trim together. Made sure all trim was aligned and fit properly. Check ignition switch and connected more under dash wiring and vacuum hoses to system.
01.24.2011
2011-01-21 Dave: Engine Plumbing
by Big Chief
01.20.2011
2011-01-10 Eddie: Engine Deliver
by Big Chief
08.03.2010
2010_08_03 MachLene: Engine Build Need Parts
by Big Chief