October 24- Pat’s Second Shipment
Here are some more of Pat’s parts that we found after his Mustang went out, so we included these in Timur’s Mustang (which is shipping with Pat’s) to make the overseas voyage.
October 22- Pat’s Exhaust Installation
Here’s some older pics of Pat’s Mustang, when we loaded up his Mustang and took it to a local shop to have them install his new exhaust system. Check it out!
October 22- Pat’s Videos! Running and Loading
Here’s Big Chief and Boss-Dog (that’s Pat, who loves Bosses!) test driving Pat’s Mustang. Big Chief is identifying some tuning that they later completed to help it run better (lifter adjustment, etc), so now it runs even better.
We’ve loaded her up, and now Boss-Dog is running her out to the road, where the transport is waiting.
And here she is, up our driveway and onto the car hauler. Here she comes, Pat!
October 22- Parts to Sell for Patrick
Here are two slideshows of all the parts we have taken off of Patrick’s Mustang and will be selling on his behalf. These are all parts that are incompatible with the upgrades Patrick had chosen, so they are still good and usable, just not on his particular Mustang.
October 22- Parts Going to Patrick
Here are the photos of all of the parts and documents we are sending with Pat’s Mustang. We also have video of his Mustang running, which we are editting now and are going to post ASAP. Also, slideshows of parts we will be selling for Patrick that he no longer needs are also forthcoming.
October 20- Loading for Transport!
Alright, the big day’s coming! Here’s P-Dog and Dale loading Pat’s Mustang up, and we’ll be transporting his GT Mustang to the shipping company to send it overseas. We’ll bet Pat can’t wait to finally get his Mustang!
October 16- Pat’s Finishing Up
We’re wrapping up the work on Patrick’s Mustang, and we’ll be sending it off overseas ASAP. Pat has some more plans for this baby in his hometown, such as an acid-dip and re-paint by a friend of his, so we only assembled the Mustang such that it can be driven. We’re cleaning and detailing it now as well. Included are also some pictures of some gauges that we’re returning. The starter is very close to the headers, to for its protection we have wrapped it in heat-resistant protective material and provided pictures.
October 6- Pat’s Hood and Stick Shifter Installation
October 3- Pat’s Undercarriage Inspection
P-Dog went through the fuse box on Pat’s Mustang and replaced the bad fuses he found, as well as did some general wiring cleanup-work (wrapping exposed wires, replacing bad wire, etc). We also did an undercarriage inspection and took photos of the new headers and brake system. As you can see, its a tight fit with those new headers, but this Mustang’s going to purr!
October 1- Pat’s Brake System Inspection
Here’s Pat inspecting Pat’s Mustang (haha, don’t get confused now!) and its brake system. So far, everything looks great! Pat and Tim also just finished installing the emergency brake system, and now its real tight and holds strong.